
By: Brianna Gleason, 7 Rivers to the Coast
Breaking Down the Cushing Road & Lubberland Drive Improvements
At this year’s Town Meeting, Newmarket voters will consider a warrant article that could have a lasting impact on the health of Great Bay and the Lamprey River.
The proposal authorizes the Town to borrow up to $1,440,000 to complete stormwater management improvements along Cushing Road and Lubberland Drive in the Moody Point neighborhood.
In this article, we’ll break down what this project means for water quality in Great Bay, and why the passing of this article would be a win for our local waters.

Why Focus on Stormwater at Moody Point?
When it rains, water runs off roads, driveways, and rooftops, picking up pollutants like oil, tire particles, metals, sediment, and nutrients. In areas with a high percentage of pavement and hard surfaces, known as impervious surfaces, that runoff flows quickly and directly into nearby waterways.
At Moody Point:
- Public roads create significant runoff
- Storm drains discharge directly to Great Bay
- Pollutants enter the Bay without treatment
This type of runoff is called non-point source pollution, and it’s one of the leading causes of water quality impairments in Great Bay.
Improving stormwater treatment at its source is one of the most effective ways to reduce pollution and protect water quality.
What the Project Would Do
If approved, the project would:
- Install four enhanced biofiltration units with internal storage
- Reconstruct portions of the roadway to direct runoff into treatment systems
- Use engineered soils and native plants to filter pollutants naturally
- Install low-maintenance systems designed to blend into the neighborhood
These systems work by slowing, capturing, and filtering stormwater before it reaches Great Bay, reducing sediment, nutrients, and other harmful pollutants.
Why This Matters for Great Bay
Great Bay is an ecological and economic cornerstone for the region. Clean water supports:
- Fisheries and shellfish habitat
- Wildlife and bird populations
- Recreational boating and paddling
- Tourism and the local economy
By treating stormwater before it enters the Bay, Newmarket would make measurable progress toward improving water quality and meeting federal water quality requirements.

Understanding the Financial Side
The warrant article authorizes borrowing up to $1.44 million, but it sets a maximum amount, not a guaranteed expenditure.
Key financial points:
- The Town is eligible for a low-interest State Revolving Fund (SRF) loan
- Up to $216,000 may be forgiven (similar to grant funding)
- The estimated tax rate impact is $0.08 in the first year, decreasing annually
- Borrowing spreads costs over time, aligning payments with the infrastructure’s lifespan
- The article was unanimously recommended by both the Town Council and the Municipal Budget Committee
If approved, the Town would move into final design and permitting, with construction targeted for 2028.
What Happens If It Doesn’t Pass?
The Town still has a responsibility to maintain public roads and address stormwater pollution.
If the article fails:
- The Town may need to fund road reconstruction through its existing Department of Public Works operating budget
- Progress on other roadway projects could be delayed
- Access to favorable financing options and principal forgiveness could be lost
- Stormwater treatment improvements could be postponed
In short, delaying improvements could mean higher costs later, both financially and environmentally.
The Bigger Picture
Stormwater infrastructure may not always be visible, but it plays a crucial role in protecting the waters that define our region. Treating runoff at Moody Point is about more than road repairs, it’s about protecting Great Bay, strengthening community resilience, and investing in long-term water quality.
Projects like the Moody Point stormwater improvements offer a valuable model for other communities working to protect local waterways. Many towns across the Great Bay watershed face similar challenges with aging roads, increasing development, and stormwater runoff that flows untreated into nearby rivers and estuaries. This project demonstrates how targeted infrastructure upgrades, such as biofiltration systems and road redesign, can reduce pollution while also maintaining safe, functional roads. It also shows how municipalities can combine local investment with state and federal funding to make water quality improvements more affordable. By addressing stormwater at its source, Newmarket is taking a proactive approach that other towns can replicate to protect shared water resources across the region.
At 7 Rivers to the Coast, we believe informed voters make strong communities. Understanding how local infrastructure decisions connect to watershed health is key to safeguarding the rivers and estuaries we all depend on.

For more information about Great Bay and watershed protection efforts, visit 7 Rivers to the Coast’s Protect Pages, ‘The Latest’, and our Events Calendar, and stay engaged in local water quality conversations.
For the full Newmarket Voter Guide click here.
Content provided by 7 Rivers to the Coast
Do you have a story you want 7 Rivers to share? Tell us about it!










